Our work

Our jobs, photographed on site.

We took these photos during or after the work. We never name our clients or give their address.

Replacement

Two floor-standing boilers replaced by two condensing wall-hung boilers

The old boilers vented through flexible aluminium flue pipes, with insulation held on by tape. Two Vaillant ecoTEC pro wall-hung boilers replace them, with magnetic filters on the system. Commissioning included a combustion test with an analyser.

  • Vaillant ecoTEC pro
  • Condensing
  • Combustion test
  • Flue
Two old floor-standing boilers in a basement, flexible aluminium flue pipes and insulation held with tape
Before
New Vaillant ecoTEC pro wall-hung boiler with a combustion analyser connected and filters on the pipes
After
Two Vaillant ecoTEC pro wall-hung boilers installed side by side in a painted brick basement
The two new wall-hung boilers side by side.

Commercial boiler room

Two Remeha Gas 620 Ace boilers

A boiler room in a residential block with two high-output gas boilers, their expansion vessels, the gas supply and the insulated flow pipes.

  • Remeha Gas 620 Ace
  • Gas
  • High output
Commercial boiler room with two red and anthracite Remeha Gas 620 Ace boilers, a yellow gas pipe and expansion vessels
Commercial boiler room: two Remeha Gas 620 Ace boilers.

Installation

Remeha wall-hung boiler with new connections

A Remeha wall-hung boiler fitted with new connections: press-fit steel pipework for the heating, a yellow gas pipe and a condensate drain.

  • Remeha
  • Press-fit steel
  • Gas
Anthracite Remeha wall-hung boiler and neighbouring appliance connected with press-fit steel pipes, a yellow gas pipe and a black drain
Remeha wall-hung boiler: new press-fit steel connections.

Air conditioning

Outdoor unit on a flat roof

A Daikin outdoor unit on rubber supports, with its refrigerant lines protected under a cover.

  • Daikin
  • Air conditioning
  • Flat roof
Daikin outdoor unit on supports on a flat roof, refrigerant lines under a cover, houses and trees in the background
Outdoor unit on a flat roof.

During servicing

What we find when we open an installation.

A combustion chamber, a pipe and a heat exchanger as we find them on call-outs: they show why regular servicing and water treatment matter.

Buderus oil boiler opened during a service, dirty and rusted combustion chamber, hand holding a cleaning brush
A dirty combustion chamberOil boiler opened before cleaning: soot and rust slow down heat transfer.
Copper pipe removed from a boiler, almost fully clogged with sludge and scale
A pipe almost blockedSludge and scale built up in a boiler pipe.
Removed plate heat exchanger for hot water, one port blocked by limescale deposits
A scaled heat exchangerLimescale in a boiler’s hot-water heat exchanger.

First contact

Describe the breakdown or the project.

A phone call is often enough. For a quote, a few lines and a photo of the appliance’s rating plate save us time.